Project

Kakarapar Atomic Power

This was one of the long term projects which included fabrication and erection of embedded plates (EP), inner containment wall liner, Calandra vault and alignment. Other tasks we performed for this project included ring liner assembly and erection, D2o tower erection, evener beam fabrication for dome lifting, spider beam fabrication for ring liner, structural, underground and aboveground pipe fabrication and erection etc. Major and critical Parts of this project were dome fabrication and erection.

For the first time in Asia we successfully lifted and aligned the dome weighing 365MT in a single lift using a heavy duty crawler crane LR11350. The IC dome was lifted 1m above ground level twice, first for 1/2 an hour and then for 2 hours, in order to relieve stresses and was checked for its horizontality, then it was lowered and aligned successfully.