It is one of the best extra dosed bridge in India over Mandovi river (Panjim, Goa) Precast segments are lifted by using bridge builders (lifting frames) and Launching Girders (LG).
Launching Girders
• Load test on these girders are done using additional loads.
• Erection of precast segment.
• Scope includes 200 m length with maximum span length 37 m.
• Our scope included fabrication, assembly, erection and launching of girders ( WT. of LG is 750 MT).
Lifting Frames
• Load test on these Frames are done using additional loads.
• Erection of precast segment.
• Our scope includes 800 m and maximum span length is 152m.
• Erection is done at 35 m from sea level.
• Our scope includes fabrication, assembly, erection and launching of Lifting frames.