Project (BANGLADESH)

Khulna Mongla Rail Bridge

This is one of the major on-going project for us. The construction of broad gauge single track Railway Bridge across river Rupsha consisting of 716.8 mtr Main Bridge. Total length of the bridge is around 5.2 kms.

Our critical activity is the erection of viaduct Steel Girder using Launching Gantry (LG). It includes the transportation of I-Girders from stacking yard to the required location and the erection of I-Girder to the proper locations.